Rail Transport in Mexico

2019 June 2019 Path to Citizenship

By  Path to Citizenship on the June 2019 Edition

Mexico has a freight railway system owned by the national government and operated by various entities under concessions (charters) granted by the national government. The railway system provides freight and passenger service throughout the country (the majority of the service is freight-oriented), connecting major industrial centers with ports and with rail connections at the United States border. Passenger rail services were limited to a number of tourist trains between 1997, when Ferrocarriles Nacionales de México suspended service, and 2008, when Ferrocarril Suburbano de la Zona Metropolitana de México inaugurated Mexico’s first commuter rail service between Mexico City and the State of Mexico. This is not including the Mexico City Metro, which started service in 1969.

Construction Mexico’s rail history began in 1837, with the granting of a concession for a railroad to be built between Veracruz, on the Gulf of Mexico, and Mexico City. However, no railroad was built under that concession.

In 1857, Don Antonio Escandón secured the right to build a line from the port of Veracruz to Mexico City and on to the Pacific Ocean. Revolution and political instability stifled progress on the financing or construction of the line until 1864, when, under the regime of Emperor Maximilian, the Imperial Mexican Railway Company began construction of the line. Political upheaval continued to stifle progress, and the initial segment from Veracruz to Mexico City was inaugurated nine years later on January 1, 1873 by President Sebastián Lerdo de Tejada.

President Lerdo and his successor Porfirio Díaz encouraged further rail development through generous concessions that included government subsidies for construction. At the beginning of his first term Díaz inherited 398 miles (640.5km) of railroads consisting almost exclusively of the British-owned Mexican Rail-way. By the end of his second term in 1910, Mexico boasted 15,360 miles (24,720km) of in-service track, mostly built by American, British and French investors.

Growing nationalistic fervor in Mexico led the Díaz administration to bring the bulk of the nation’s railroads under national control through a plan drafted by his Minister of Finance, José Yves Limantour. The plan, implemented in 1909, created a new government corporation, Ferrocarriles Nacionales de México (FNM), which would exercise control of the main trunk rail lines through a majority of share ownership.

Nationalization

The rail system deteriorated greatly from neglect during the period of the Mexican Revolution. Following the Revolution, the entirety of the Mexican rail system was nationalized between 1929 and 1937. In 1987 the government merged its five regional railroads into FNM. During the later period of national ownership, FNM suffered significant financial difficulties, running an operating deficit of $552 million (37 percent of its operating budget) in 1991. Competition from trucking and shipping de-creased railroad’s share of the total freight market to about 9 percent, or about half of rail’s share a decade earlier.

Map of first Mexican rail line between Veracruz and Mexico City

Privatization

In 1995, the Mexican government announced that the FNM would be privatized and divided into four main systems. As part of the restructuring for privatization, FNM suspended passenger rail service in 1997.

In 1996, Kansas City Southern (KCS), in a joint venture with Transportacion Maritima Mexicana (TMM), bought the North-east Railroad concession that linked Mexico City, Monterrey, the Pacific port at Lázaro Cárdenas and the border crossing at Laredo. The company was initially called Transportación Ferro-viaria Mexicana (TFM), but was renamed Kansas City Southern de México (KCSM) in 2005 when KCS bought out TMM’s interests. KCS’s systems in the United States and Mexico jointly form end-to-end rail system linking the heartlands of Mexico and the United States.

The Northwest Railroad concession, connecting Mexico City and Guadalajara with the Pacific port of Manzanillo and various crossings along the United States border was sold to a joint venture between Grupo Mexico and Union Pacific Railroad in 1998 during the presidency of Dr. Ernesto Zedillo (which later occupied the position of Director of the Board of Union Pacific). The company operates as Ferrocarril Mexicano or Ferromex. Ferromex’s freight volumes have increased; it hauled a record 22,365 million tonne-km in the first 6 months of 2010. Also, Ferrosur, the railroad serving Mexico City and cities/ports southeast of Mexico City, hauled their own record 3,565 million tonne-kilometers.

Ferrosur train in Veracruz

There were two southern concessions, merged in 2000 to form Ferrosur. Ferrosur operates the line between Mexico City and the Gulf of Mexico port of Veracruz. In 2005, Ferrosur was bought by Ferromex’s parent company. KCSM challenged the acquisition and the merger failed to receive regulatory approval. However, in March 2011, a tribunal ruled in Grupo Mexico’s favor, and the merger was permitted.

The three major Mexican railroads jointly own Ferrocarril y Terminal del Valle de México (Ferrovalle) which operates railroads and terminals in and around Mexico City.

High-speed rail

The Secretariat of Communications and Transport of Mexico proposed a high-speed rail link[5] that will transport its passengers from Mexico City to Guadalajara, Jalisco, with stops in the cities of Querétaro, Guanajuato, Leon and Irapuato; and a connected line running from the port city of Manzanillo to Aguascalientes. The train would travel at 300km/h,[6] and would al-low passengers to travel from Mexico City to Guadalajara in just 2hours at an affordable price (the same trip by road would last 7hours). The network would also be connected to Monterrey, Chilpancingo, Cuernavaca, Toluca, Puebla, Tijuana, Hermosillo, Cordoba, Veracruz, Oaxaca, Colima, Zacatecas, Torreon Chihuahua, San Luis Potosi, Mexicali, Saltillo, and Acapulco by 2015. The whole project was projected to cost 240billion pesos, or about 25billion dollars. Mexican billionaire Carlos Slim expressed an interest in investing in high-speed rail.

Ferromex map

Revival of passenger service President Enrique Peña Nieto proposed a return to services of intercity trains, the proposed projects are Mexico City Toluca (construction began July 7, 2014), the Peninsular train (Yucatán-Mayan Riviera), Mexico Querétaro high speed train starts construction October 2014 and will operate speeds up to 300km/h (with expansion to Guadalajara) and Puebla-Tlaxcala-Mexico City.

On November 3, 2014, China Railways Construction Corporation associated with Prodemex, Teya and GHP has won the contract to build the high Speed train Mexico City-Querétaro. The estimated cost will be close to 4 billion dollars, to be finished by the end of 2017 and will be fully operational by spring 2018. However, Mexico canceled the contract four days later because of doubts over the bidding process. In 2015, Mexico opened a new tender, which was revoked again. Hence, Mexico could indemnify China Railway Construction Corporation $1.31m.

President-elect Andrés Manuel López Obrador announced a US$7.4 billion plan to build a tourist and freight railway on the Yucatán Peninsula in September 2018. The project, named the Mayan Train, began construction in December 2018 and will connect Palenque to Cancún, but remains controversial with environmentalists and indigenous rights activists.

The full edition or view it online




Leave a Reply